Water Licensing & Regulatory Compliance

Many water projects need authorisation before water can be abstracted, stored or discharged. CWE manages the licensing and registration process alongside the engineering, so compliance is built into the project from day one.

START A PROJECT 010 730 0051
  • Licensing alongside engineering
  • Specialist studies coordinated
  • Ongoing compliance support
Engineer and site manager reviewing documents beside farm borehole headworks

The law

Why authorisation matters

Under the National Water Act, certain water uses need authorisation. These include taking water from a borehole, storing water and discharging wastewater, unless the use falls within Schedule 1 or a General Authorisation.

Using water without the right authorisation can delay a project and create legal risk for the owner. Checking the requirements early means the design, the paperwork and the build stay in step.

Borehole test pumping beside a farm shed, with generator and flowing discharge pipe

What we do

Licensing services

Applications, registration and the work that follows approval.

Borehole Registration

Registering borehole water use with the Department of Water and Sanitation and the municipality where required.

Borehole registration

Compliance support

Meeting licence conditions, with monitoring and water quality reporting.

Enquire about water licensing

Routes

Finding the right authorisation route

Not every water use needs a full licence. Small uses may fall under Schedule 1, others need registration under a General Authorisation, and larger or higher-risk uses need a Water Use Licence.

The route depends on what the water is used for, how much is taken, where the site is and what is discharged. We assess this first so the application matches the project.

Authorisation routes

Planning a borehole, plant or discharge?

Get the authorisation right from the start.

START A PROJECT 010 730 0051

How it works

From planned use to licence conditions

Licensing runs alongside the engineering, not after it.

  1. 01

    Assess the planned water use

    What the water is for, how much and from where.

  2. 02

    Confirm the authorisation route

    Schedule 1, General Authorisation or full licence.

  3. 03

    Coordinate specialist studies

    Registered geohydrologists and environmental practitioners where required.

  4. 04

    Prepare and submit the application

    Supporting information compiled and submitted.

  5. 05

    Respond to authority queries

    Additional information supplied when requested.

  6. 06

    Meet licence conditions

    Monitoring and reporting set up for the site.

Supporting information

What an application can involve

The information needed depends on the water use and the authorisation route. Where specialist studies are required, CWE works with registered specialists.

Typical requirements

  • Site and water use details
  • Geohydrological report and yield test results
  • Water quality analysis
  • Environmental and public participation requirements where applicable
  • Engineering designs and drawings
  • Ongoing monitoring and reporting conditions
Drawings, report, water sample and hard hat in a site office overlooking a steel tank

Water licensing questions

What clients ask about authorisation.

Talk to a specialist

010 730 0051START A PROJECT

Do I need a licence for my borehole?

It depends on how the water is used, how much is taken and where the site is. Some domestic uses fall under Schedule 1, some uses need registration under a General Authorisation and others need a Water Use Licence. We assess the planned use and confirm the route.

What is a General Authorisation?

A General Authorisation allows certain water uses within set limits without a full licence. The use usually still has to be registered with the Department of Water and Sanitation.

What is a Water Use Licence Application (WULA)?

A WULA is the full application to the Department of Water and Sanitation for water uses that are not covered by Schedule 1 or a General Authorisation.

Who submits the application?

The application is made in the name of the water user. CWE prepares and coordinates it, and works with registered specialists where studies are needed.

How long does it take?

Timeframes vary. They depend on the type of water use, the specialist studies and public participation required, the completeness of the application and the authority's queries. We can't promise an approval or a processing time.

Can you handle licensing for a project you're also engineering?

Yes. That's the main benefit: the designs, yield tests and water quality data needed for the application come from the same project team.

Related services

Borehole Drilling & Development

Borehole drilling and development.

Read more

Wastewater Treatment & Recycling

Wastewater treatment and recycling.

Read more

Water Storage & Distribution

Water storage and distribution.

Read more

Water System Monitoring & Maintenance

Monitoring and SLA support.

Read more

Discuss your water use authorisation

Tell us about the site, the water source and how the water will be used or discharged.

010 730 0051enquiries@civicwater.co.za