Borehole Development
Borehole Yield Testing
Yield testing measures how much water a borehole can supply and how quickly the water level recovers after pumping. CWE uses the results to recommend a pumping rate, pump size and storage capacity.
- Step and constant-rate tests
- Water quality sampling
- Clear abstraction recommendation

Why test first
Test before you equip
A blow yield during drilling gives only a rough indication. Equipping a borehole on that figure risks an oversized pump that runs dry, burns out or damages the borehole.
A proper pumping test shows how the water level responds over time and how quickly it recovers, giving a defensible sustainable yield.

Test types
Which tests are run
Tests are selected to suit the borehole and the intended use. Larger abstractions and critical supplies warrant longer tests.
Pumping tests
| Test | What it shows |
|---|---|
| Step test | How drawdown changes at increasing pumping rates |
| Constant-rate test | Aquifer behaviour over an extended period at a fixed rate |
| Recovery test | How quickly the water level returns once pumping stops |
| Quality sampling | Chemical, physical and microbiological water quality |
Results
How the results are used
The test report gives the recommended pumping rate, pumping hours and equipment requirements.
Results inform
- Pump selection and installation depth
- Recommended daily abstraction and pumping hours
- Storage volume to balance supply and demand
- Treatment requirements from the water analysis
- Water-use registration information
Yield testing questions
Common questions about pumping tests.
How long does a yield test take?
Duration depends on the borehole and its intended use. Short tests suit small domestic supplies; larger or critical supplies need longer constant-rate and recovery tests.
Can an old borehole be tested?
Yes. Existing boreholes are often tested before re-equipping or when a site's demand changes.
Is water quality tested at the same time?
Yes. Samples are taken during the test and analysed by a laboratory so treatment needs are known early.
What happens if the yield is low?
The system is designed around it, for example with longer pumping hours, more storage, or an additional source.
Related services
Borehole Drilling & Development
Full borehole development from siting to equipping.
Read moreBorehole Siting & Geohydrological Surveys
Geohydrological surveys to choose the drilling point.
Read moreBorehole Water Treatment
Treatment designed from the water analysis.
Read moreWater Storage & Distribution
Storage sized to balance yield and demand.
Read moreBook a yield test
Share the borehole location, depth if known and how you plan to use the water.