Skip to content
Civic Water EngineeringSTART A PROJECT

Borehole Development

Borehole Siting & Geohydrological Surveys

A good borehole starts in the right place. CWE combines desktop study and field survey to choose a drilling point with the best evidence for water.

START A PROJECT 010 730 0051
  • Desktop and field study
  • Geophysical survey
  • Dolomite risk awareness
Hydrogeologist with survey equipment in open veld

Method

Choosing a borehole drilling point

Groundwater moves through fractures, faults and contact zones that are invisible from the surface. A siting survey looks for those structures before money is spent on drilling.

The desktop study reviews geological maps, existing borehole data and aerial imagery; the field survey tests promising targets on the ground.

Resistivity survey instrument and cables at a farm fence, with a worker placing a stake

Process

How a siting survey works

Four steps from map to marked drilling point.

  1. 01

    Desktop study

    Geology, existing boreholes and imagery reviewed to find targets.

  2. 02

    Field survey

    Geophysical methods test targets on site.

  3. 03

    Point selection

    Drilling points ranked and marked, considering access and setbacks.

  4. 04

    Siting report

    Recommended points, expected depth range and drilling notes.

Dolomite areas

Borehole drilling in dolomite areas

Parts of Gauteng and North West sit on dolomite, where drilling and abstraction can contribute to sinkhole risk. These sites need additional investigation and appropriate approvals before drilling.

Water use authorisation for the borehole can be handled alongside the survey and drilling.

Water licensing & compliance

Considered on every site

  • Dolomite and sinkhole risk zones
  • Setbacks from septic tanks, sewers and boundaries
  • Access for the drilling rig
  • Proximity to existing boreholes
  • Intended water use and demand

Borehole siting questions

What clients ask before a survey.

Talk to a specialist

010 730 0051START A PROJECT

Do I really need a siting survey?

It is not compulsory, but it reduces the risk of a dry or low-yielding borehole and usually costs far less than a failed hole.

What methods do you use?

Typically a desktop study combined with geophysical methods such as resistivity or magnetic surveys, chosen to suit the geology.

My property is on dolomite. Can I still drill?

Possibly, but dolomite areas need additional investigation and the relevant approvals before drilling. CWE will advise on what applies.

How many points do you mark?

Usually a primary point and one or more alternatives, ranked by evidence and practicality.

Related services

Borehole Drilling & Development

Full borehole development from siting to equipping.

Read more

Borehole Yield Testing

Confirm a sustainable yield once drilled.

Read more

Borehole Water Treatment

Treat borehole water to drinking quality.

Read more

Solar Water Pumping & Solar Integration

Solar pumping sized to the borehole.

Read more

Request a siting survey

Share your site location, property size and what you need the water for.

010 730 0051enquiries@civicwater.co.za
PROJECT ENQUIRYALL FIELDS MARKED * ARE REQUIRED