---
title: "Borehole Yield Testing | Civic Water Engineering"
url: https://civicwater.co.za/services/borehole-drilling/yield-testing
description: "Borehole yield testing with step and constant-rate tests and water quality sampling, so pumps, storage and treatment are sized on real data, not guesswork."
lang: en-ZA
---

Skip to content

Borehole Development

# Borehole Yield Testing

Yield testing measures how much water a borehole can supply and how quickly the water level recovers after pumping. CWE uses the results to recommend a pumping rate, pump size and storage capacity.

START A PROJECT
010 730 0051: +27107300051

- Step and constant-rate tests
- Water quality sampling
- Clear abstraction recommendation

Image: Test-pumping setup with a flow meter at a borehole head on farmland (https://civicwater.co.za/__l5e/assets-v1/529af202-5cd4-491a-a012-e411eab18813/borehole-test-pumping-flow-meter-farmland.webp)

Why test first

## Test before you equip

A blow yield during drilling gives only a rough indication. Equipping a borehole on that figure risks an oversized pump that runs dry, burns out or damages the borehole.

A proper pumping test shows how the water level responds over time and how quickly it recovers, giving a defensible sustainable yield.

Enquire about a borehole

Image: Water-level dipper tape lowered into borehole casing during a pumping test (https://civicwater.co.za/__l5e/assets-v1/192dbd2c-1100-48ca-ab99-39c4f2db8772/water-level-dipper-borehole-casing.webp)

Test types

## Which tests are run

Tests are selected to suit the borehole and the intended use. Larger abstractions and critical supplies warrant longer tests.

Enquire about a borehole

Pumping tests

| Test | What it shows |
| --- | --- |
| Step test | How drawdown changes at increasing pumping rates |
| Constant-rate test | Aquifer behaviour over an extended period at a fixed rate |
| Recovery test | How quickly the water level returns once pumping stops |
| Quality sampling | Chemical, physical and microbiological water quality |

Results

## How the results are used

The test report gives the recommended pumping rate, pumping hours and equipment requirements.

Discuss your water requirements

Results inform

- Pump selection and installation depth
- Recommended daily abstraction and pumping hours
- Storage volume to balance supply and demand
- Treatment requirements from the water analysis
- Water-use registration information

## Yield testing questions

Common questions about pumping tests.

Talk to a specialist

010 730 0051 (+27107300051)START A PROJECT

### How long does a yield test take?

Duration depends on the borehole and its intended use. Short tests suit small domestic supplies; larger or critical supplies need longer constant-rate and recovery tests.

### Can an old borehole be tested?

Yes. Existing boreholes are often tested before re-equipping or when a site's demand changes.

### Is water quality tested at the same time?

Yes. Samples are taken during the test and analysed by a laboratory so treatment needs are known early.

### What happens if the yield is low?

The system is designed around it, for example with longer pumping hours, more storage, or an additional source.

## Related services

### Borehole Drilling & Development

Full borehole development from siting to equipping.

Read more
https://civicwater.co.za/services/borehole-drilling

### Borehole Siting & Geohydrological Surveys

Geohydrological surveys to choose the drilling point.

Read more
https://civicwater.co.za/services/borehole-drilling/borehole-siting

### Borehole Water Treatment

Treatment designed from the water analysis.

Read more
https://civicwater.co.za/services/water-treatment/borehole-water-treatment

### Water Storage & Distribution

Storage sized to balance yield and demand.

Read more
https://civicwater.co.za/services/water-storage

## Book a yield test

Share the borehole location, depth if known and how you plan to use the water.

010 730 0051 (+27107300051)enquiries@civicwater.co.za

HEAD OFFICE

2 Bream Rd, Wadeville, Germiston, 1428: https://www.google.com/maps/search/?api=1&query=2%20Bream%20Rd%2C%20Wadeville%2C%20Germiston%2C%201428

CAPE TOWN

Unit 9, 12 Square Street, Watershed Park, Stikland Industrial, 7530: https://www.google.com/maps/search/?api=1&query=Unit%209%2C%2012%20Square%20Street%2C%20Watershed%20Park%2C%20Stikland%20Industrial%2C%207530

## Structured data

```json
{
  "@context": "https://schema.org",
  "@type": "BreadcrumbList",
  "itemListElement": [
    {
      "@type": "ListItem",
      "position": 1,
      "name": "Home",
      "item": "https://civicwater.co.za"
    },
    {
      "@type": "ListItem",
      "position": 2,
      "name": "Services",
      "item": "https://civicwater.co.za/services"
    },
    {
      "@type": "ListItem",
      "position": 3,
      "name": "Borehole Drilling",
      "item": "https://civicwater.co.za/services/borehole-drilling"
    },
    {
      "@type": "ListItem",
      "position": 4,
      "name": "Yield Testing",
      "item": "https://civicwater.co.za/services/borehole-drilling/yield-testing"
    }
  ]
}
```